Plan


An artist's view

Building 186 Status

Introduction

The VeLo Burn-in System will be operated in a portion of the clean room in Building 186 located at CERN. In this page the status of all that is required for a successful operation is detailed. Apart from the Burn-in this will include the module inspection that will be performed on a module on arrival.