HV Summary Scheme



PCB mounted in PP0 box



Power Supply Side



Patch Panel 1 Side


The Velo high Voltage Patch Panel 0(PP0)

Objective

The objective of the PP0 is to arrange and distribute the high voltage channels from the multi channel power supply to the 56 core cables. PP0 will be located in the counting room and it is at this point that hybrid guard will be connected to the high of the HV channel and thus powering the third channel of the HV channel. It is also that at this point that the current of the hybrid guard should be measured.

Implementation

Shopping List