|
3.4 |
|
|
|
|
|
|
|
1 |
3.4.1 |
Architecture Design |
DUE |
30-Jun-02 |
|
|
Description |
Document
describing architecture to be used for the upgrade of SAM |
|
|
|
|
|
|
|
|
Metric |
Document is produced |
|
|
|
|
|
Risk and/or |
None |
|
|
|
|
Dependency |
|
|
|
|
|
Status |
Not started |
Status Date |
|
Modified Due Date |
|
J |
|
|
|
|
|
|
2 |
3.4.2 |
Prototype CDF-SAM
Interface |
DUE |
30-Jun-02 |
|
|
Description |
A
preliminary interface between the CDF analysis framework and SAM including a
GUI for large |
|
|
scale
declaration of data-sets to SAM and an interface to the SAM data retrieval
system. |
|
|
|
|
|
Metric |
Demonstration of functionality on UK site. |
|
|
|
|
|
Risk and/or |
None |
|
|
|
|
Dependency |
|
|
|
|
|
Status |
Not started |
Status Date |
|
Modified Due Date |
|
J |
|
|
|
|
|
|
3 |
3.4.3 |
Phase-1 SAM Development |
DUE |
30-Sep-02 |
|
|
Description |
SAM modified
to include GridFTP transport option; Condor-G job submission to a hand-chosen |
|
|
remote site;
decentralised SAM information services. |
|
|
|
|
|
Metric |
Demonstration of functionality on a UK site. |
|
|
|
|
|
Risk and/or |
May be problems with
interface to GSI. |
|
|
|
|
Dependency |
Depends on
Condor-g deployment. |
|
|
|
|
Status |
Not started |
Status Date |
|
Modified Due Date |
|
J |
|
|
|
|
|
|
4 |
3.4.4 |
Final CDF-SAM interface |
DUE |
30-Sep-02 |
|
|
Description |
Based upon
prototype results, final design will be implemented. |
|
|
|
|
|
|
|
|
Metric |
Demonstration of interface on UK site. |
|
|
|
|
|
Risk and/or |
Depends on
prototype. |
3.4.2 |
|
|
|
Dependency |
|
|
|
|
|
Status |
Not started |
Status Date |
|
Modified Due Date |
|
J |
|
|
|
|
|
|
5 |
3.4.5 |
CDF Monte Carlo Production
as a SAM Task. |
DUE |
31-Dec-02 |
|
|
Description |
Extend CDF
use of SAM from simple file retrieval to fully integrated Monte Carlo
production. |
|
|
|
|
|
|
|
|
Metric |
Demonstration of CDF Monte Carlo production using SAM in the UK |
|
|
|
|
|
Risk and/or |
Depends
on completion of related work within the CDF collaboration to |
|
|
|
|
Dependency |
allow
communication with various databases (geometry, calibration, etc). |
|
|
|
|
Status |
Not started |
Status Date |
|
Modified Due Date |
|
J |
|
|
|
|
6 |
3.4.6 |
Prototype SAM Monte Carlo
Production system using Resource Broker |
DUE |
31-Mar-03 |
|
|
Description |
Extension of
SAM functionality to include use of resource broker. Will also include
monitoring |
|
|
services and
request interface. |
|
|
|
|
|
Metric |
Demonstration of SAM prototype with specified functionality in the UK. |
|
|
|
|
|
Risk and/or |
Depends on D0
architecture definition |
3.4.1 |
|
|
|
Dependency |
and
development of associated areas within D0 |
|
|
|
|
Status |
Not started |
Status Date |
|
Modified Due Date |
|
J |
|
|
|
|
7 |
3.4.7 |
Demonstration of CDF/SAM
jobs moving to data. |
DUE |
31-Mar-03 |
|
|
Description |
Adaptation
of SAM to move jobs to data as an option needs to be integrated into CDF
framework. |
|
|
|
|
|
|
|
|
Metric |
Demonstration of CDF/SAM jobs moving to data in the UK. |
|
|
|
|
|
Risk and/or |
Depends on
development of this SAM functionality by the core SAM team. |
|
|
|
|
Dependency |
|
|
|
|
|
Status |
Not started |
Status Date |
|
Modified Due Date |
|
J |
|
|
|
|
8 |
3.4.8 |
Report on first year
SAM/CDF Progress |
DUE |
31-Mar-03 |
|
|
Description |
A brief
summary document that describes progress in the first year and highlights
problems and |
|
|
issues. This
will be used to set/modify targets for the remainder of the project. |
|
|
|
|
|
Metric |
Document produced |
|
|
|
|
|
Risk and/or |
None |
|
|
|
|
Dependency |
|
|
|
|
|
Status |
Not started |
Status Date |
|
Modified Due Date |
|
J |
|
|
|
|
9 |
3.4.9 |
Pilot SAM Grid for D0
users. |
DUE |
30-Sep-03 |
|
|
Description |
Documentation
and demonstration of a limited D0-grid based on SAM capable of providing a
service |
|
|
to
'intelligent users' in the UK. Functionality includes automated submission of
Monte Carlo and |
|
|
analysis
jobs. |
|
|
Metric |
Documented demonstration. |
|
|
|
|
|
Risk and/or |
Depends on
much associated work with core SAM team and D0 |
|
|
|
|
Dependency |
collaboration. |
|
|
|
|
Status |
Not started |
Status Date |
|
Modified Due Date |
|
J |
|
|
|
|
# |
3.4.10 |
Demonstration of SAM as a
Data Handling System for CDF |
DUE |
31-Dec-03 |
|
|
Description |
Deliver SAM
for use on CDF's central analysis facility as the data handling system. |
|
|
|
|
|
|
|
|
Metric |
Demonstration of SAM for data handling in UK and Fermilab |
|
|
|
|
|
Risk and/or |
Depends on
formal adoption of SAM by CDF |
|
|
|
|
Dependency |
|
|
|
|
|
Status |
Not started |
Status Date |
|
Modified Due Date |
|
J |
|
|
|
|
# |
3.4.11 |
Robust SAM-based grid
service for D0 |
DUE |
31-Mar-04 |
|
|
Description |
Demonstration
and documentation of a robust SAM-based service for significant D0 physics |
|
|
production
tasks suitable for use by general collaboration members. |
|
|
|
|
|
Metric |
Documented demonstration |
|
|
|
|
|
Risk and/or |
Depends on
development of SAM and D0 software and by formal |
|
|
|
|
Dependency |
acceptance by
the D0 collaboration. |
|
|
|
|
Status |
Not started |
Status Date |
|
Modified Due Date |
|
J |
|
|
|
|
# |
3.4.12 |
Final Report on SAM/CDF
integration |
DUE |
31-Dec-04 |
|
|
Description |
A document
on the final product for CDF. Issues addressed include the technical success
of the |
|
|
integration
of SAM and the degree to which CDF has adopted this for data handling. |
|
|
|
|
|
Metric |
Document |
|
|
|
|
|
Risk and/or |
|
|
|
|
|
Dependency |
|
|
|
|
|
Status |
Not started |
Status Date |
|
Modified Due Date |
|
J |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|