3.2
1 3.2.1 Requirements, Architecture and Design Definition DUE 15-Nov-02
Description Document that establishes LHCb requirements for Grid based analysis and MC production.
Document establishes architecture constraints and leads to detailed design definition
 
Metric Document
 
Risk and/or None    
Dependency       This is link to Technology Review
Status Complete Status Date 17-Jan-03 Modified Due Date   J This architecture document will continue to evolve
2 3.2.2 Prototype of Grid Interface DUE 31-Dec-02
Description Command line interface allows simple Gaudi analysis and Monte Carlo production jobs to be  Click here for changeform
submitted to batch system. Job submission scripts automatically generated and some Command line interface is in fact
error handling available. GANGA GUI to scripts. hidden from user but does exist.
Metric Demonstration of prototype for LHCb and ATLAS in the UK.
 
Risk and/or None    
Dependency      
Status Complete Status Date 14-Jan-03 Modified Due Date   J
3 3.2.3 Webpage mock GUI for feedback DUE  
Description A simple web-page mock up of the GANGA GUI design to allow user feedback
 
  This was merged with 3.2.2 above 
Metric Creation of web-page mock GUI and is no longer and active milestone
  (Click here for link for more info.)
Risk and/or      
Dependency      
Status In Progress Status Date   Modified Due Date   J
4 3.2.4 Remote Grid Mass-Storage Write Capability DUE  
Description Demonstration that the EDG RFIO from WP5 works in the LHCb context.
  Remote RFIO was not released by EDG yet. 
  LHCb are re-assessing the need
Metric Demonstration of basic functionality. (Click here for link for more info.)
 
Risk and/or Depends on RFIO being produced by EDG WP5     Click here for changeform
Dependency       Deliverable Deleted due to the non
Status On  Hold Status Date   Modified Due Date   J delivery of RFIO by EDG
5 3.2.5 First GANGA Prototype DUE 31-Mar-03
Description Emphasis is on interfacing the GANGA protoype descrubed by 3.2.2 to the EDG middleware
 
 
Metric LHCb demonstration of defined functionality.
 
Risk and/or EDG WP1 and WP3 tools 3.2.2  
Dependency       Included in CVS release in early April
Status Complete Status Date 12-Mar Modified Due Date   J To be demo'd at GridPP7?
6 3.2.6 User-Controlled Site Configuration DUE 30-Sep-03
Description Development of syntax of a generic site configuration file.
 
 
Metric Demonstration of test Gaudi/Athena jobs running on Grid using standard conditions
 
Risk and/or      
Dependency      
Status Complete Status Date   Modified Due Date   J See Q11 Ganga report.
7 3.2.7 Second GANGA Prototype DUE 31-Mar-04
Description GANGA prototype that includes GUI access to middleware and Gaudi/Athena services.
Functionality includes translation of meta-data into physical files; replica service to optimise location
of data; query facility to estimate resources; monitoring facilities for submitted jobs.
Metric Demonstration of prototype with specified functionality.
 
Risk and/or EDG WP1 WP2 WP3 services.    
Dependency      
Status In Progress Status Date   Modified Due Date   J
8 3.2.8 Interface experiment Grid tools to GANGA DUE 30-Sep-04
Description Incorporated MC production system into GANGA supporting user-query of environment. Interface to
 experiment specific installation tools.
 
Metric Demonstration of prototype with specified functionality.
 
Risk and/or      
Dependency      
Status Not started Status Date   Modified Due Date   J
9 3.2.9 Final GANGA Version DUE 31-Dec-04
Description Document and demonstration of final GANGA product.
 
 
Metric Document and demonstration in LHCb and ATLAS contexts.
 
Risk and/or      
Dependency      
Status Not started Status Date   Modified Due Date   J