3.3
1 3.3.1 PVSS Review & Development DUE 30-Sep-02
Description Adapt & develop current PVSS system to the DATA Challenges & the developing MC production 
system. Review the current PVSS based control system & compare with WP3 middleware
 
Metric Document and prototype
 
Risk and/or      
Dependency      
Status Complete Status Date 10-Sep-02 Modified Due Date   J
2 3.3.2 Monitoring Prototype DUE 31-Mar-03 3.3.2 Monitoring Prototype DUE 31-Dec-02
Description Initial development of Grid based monitoring and control system Conclusion of 3.3.1 is not to use WP3 stuff. Description Introduce monitoring based on WP3 middleware (assumes WP3 APIs exist) & assess whether to 
Introduces the use of Work Flow Description Language Click her for changeform maintain current PVSS system.
  Old deliverable is here --->  
Metric Demo in the UK Conclusion of 3.3.1 was not to Metric Document and prototype
   use WP3 stuff so this redefined   
Risk and/or        3.3.2 Risk and/or API's to WP3 are produced in time.    
Dependency         Dependency      
Status Complete Status Date 19-Mar-03 Modified Due Date   J Status In Progress Status Date 17-Jan-03 Modified Due Date   J
3 3.3.3 First prototype of New Experimental System DUE 30-Sep-03 3.3.3 First prototype of New Experimental System DUE 30-Jun-03
Description Introduce monitoring of details of a running job. eg. run number. A first implementation of data  Description Introduce monitoring of details of a running job eg. run number. A first implementation of online 
quality monitoring Click her for changeform histogram production.
  Old deliverable is here --->  
Metric Demonstration of new system Broadened scope somewhat as a  Metric Demonstration of new system
  better understanding achieved.  
Risk and/or       Intoduces some delay Risk and/or      
Dependency         Dependency      
Status Complete Status Date   Modified Due Date   J Status Not started Status Date   Modified Due Date   J
4 3.3.4 Online Data Quality DUE 31-Dec-03 Title and description modified to agree with 3.3.4 Online Histogram Monitoring DUE 31-Dec-03
Description Detailed online visualisation and data quality assurance the change in 3.3.3. See the above ChangeForm Description Sophisticated online histogram production & data quality assurance.
   
   
Metric Release of production version. Metric Release of production version.
   
Risk and/or       Risk and/or      
Dependency       Dependency      
Status Not started Status Date   Modified Due Date   J Status Not started Status Date   Modified Due Date   J
5 3.3.5 Interface to GANGA DUE 30-Sep-04
Description Merge the current MC production & monitoring system into GANGA
 
 
Metric Prototype exists
 
Risk and/or Ganga exists    
Dependency      
Status Not started Status Date   Modified Due Date   J
6 3.3.6 Final GANGA Version DUE 31-Dec-04
Description Document describing Monte Carlo monitoring and production with GANGA and public demonstration
 
 
Metric Document and demonstration
 
Risk and/or      
Dependency      
Status Not started Status Date   Modified Due Date   J