3.7
1 3.7.1 Develop XLM schema for lattice QCD calculations DUE 30-Jun-02
Description Develop an XLM schema to define the format of the metadata documents for lattice QCD data files
 
 
Metric Schema defined.
 
Risk and/or      
Dependency      
Status Complete Status Date   Modified Due Date   J
2 3.7.2 Develop meta-data catalogue for simulation data DUE 30-Jun-02
Description Develop and XML database server for storing and querying lattice QCD metadata. Access will be
via command-line tools.
 
Metric Demonstration of command line access to meta-data catalogue.
 
Risk and/or      
Dependency      
Status Complete Status Date   Modified Due Date   J See end of talk linked to C20
3 3.7.3 Develop browser for meta-data catalogue DUE 30-Sep-02
Description Develop browser to allow users to query metadata catalogue. Brower will supply a single interface
to the metadata and ultimately the data.
 
Metric Demonstration of browser access to metadata catalogue.
 
Risk and/or   3.7.2   Delayed to Dec-31 because they are early adopters of OGSA-DAI STUFF
Dependency       To be demonstrated at GridPP6
Status Complete Status Date   Modified Due Date   J See end of talk linked to C30
4 3.7.4 Implement four-site data-storage and access DUE 30-Sep-02 3.7.4 Implement four-site data-storage and access DUE 30-Sep-02
Description Deployment of a small grid using EG testbed release middleware, allowing  members of UKQCD Click her for changeform Description Deployment of a small grid using EG testbed release middleware, allowing all members of UKQCD
access to data at at least two if the four sites (via browser and/or line commands at this point). Old deliverable is here ---> access to data at all four sites (via browser and/or line commands at this point).
  Only 3 of the 4 sites are up and  
Metric Users can access data in a site-transparent manner. running due to manpower Metric Users can access data in a site-transparent manner.
  shortages.  
Risk and/or Stable EDG middleware       Risk and/or Stable EDG middleware    
Dependency       (See table on P2 of the link to C40) Dependency      
Status Complete Status Date 23-Apr-03 Modified Due Date   J NOW FOUR SITES: 8/May/2003 Status In Progress Status Date 22-Jan-03 Modified Due Date   J
5 3.7.5 Pilot job submission system DUE 31-Dec-03
Description Pilot job submission system to access selected test nodes Click her for changeform
submitted Click her for changeform2
  UKQCD originally went for an
Metric Demonstration of functionality accellerated project by doubling
  up staffing. Now revert to 1.0 FTE
Risk and/or       so time frame slips back a bit
Dependency        
Status In Progress Status Date 10-May-03 Modified Due Date   J
6 3.7.6 Full job submission system DUE 01-Jun-04
Description Data access and job submission system across available UKQCD storage and compute resources Click her for changeform
  Follows on from delay above
  an reflects increased importance
Metric Demonstration of functionality of submission mechanism over
  portal
Risk and/or Stable EDG release 3.7.5    
Dependency      
Status Not started Status Date   Modified Due Date   J